Water

River engineering

Thanks to its strong expertise in sedimentology, river morphology, mud flows and hydro-sedimentary modelling, Artelia has an in-depth understanding of rivers, enabling it to design operational schemes that do not interfere with natural flow conditions and to assess and restore existing structures. Through reasoned use of conventional techniques (embankments, rockfill protection, sills and river training works) and more innovative ones (restoration of unconfined flow conditions), Artelia strives to reconcile the need for flood and erosion protection, navigation and tourist activities with respect for the ecological functions of aquatic environments. In Poland, Artelia is hence providing design and construction supervision services for a programme of works to improve flood protection and modernise the river system flowing through the city of Wroclaw.

Gremillon stream restoration works at Essey-les-Nancy

Client : Communauté Urbaine du Grand Nancy
Country : France

Date : 2013 - 2016

Services :
Definition of restoration works
Statutory documents
Design and construction supervision

SCHADEX hydrological studies in France

Client : EDF-DTG
Country : France

Date : 2010 - 2014

Services :
  • Performance of at least 10 extreme flood calculation studies per year over a 4-year period.
  • Development of the partnership between Sogreah and EDF: shared work on European projects

Resectioning of the river Deûle between Emmerin and Deûlémont

Lille
Client : Voies Navigables de France (VNF)
Country : France

Date : 2009 - 2014

Services :
  • Project management (partial) from the design study to final acceptance
  • Supplementary assignments
    – Definition of geotechnical studies 
    – Sheet pile assessment
    – Inspection of working designs during works
  • Impact assessment study of resectioning the river to 4 400 t

Paris-Oise multimodal hub in Longueil-Sainte-Marie

Client : Syndicat d'Aménagement de l'Oise (SAO)
Country : France

Date : 2010 - 2013

Services :
  • Design and construction supervision

Repairing sills in the Arly gorge

Client : Conseil Général de la Savoie
Country : France

Date : 2011 - 2012

Services :
  • Partial design and construction supervision services

Expert appraisal of weir of Le Fresne-sur-Loire

Client : Voies Navigables de France (VNF)
Country : France

Date : 2010 - 2011

Services :
  • Examination of existing data
  • Expert appraisal of groynes and analysis of deterioration sources
  • Expert appraisal of erosion area on the left bank of Meslet Island
  • Supplementary or alternative development proposals designed to enable further experimentation
  • Conditional part aimed at performing a feasibility study of the final scenario composed of one or several supplementary development plans

Construction of a stopover in Barillon dock in Rouen

Saint-Gervais basin - Conditional stage : so called final stopover
Client : Communauté d'Agglomération Rouennaise
Country : France

Date : 2009 - 2011

Services :
  • Design services and project supervision

Development of the upstream banks of Seguin island at Boulogne Billancourt

Client : Société Anonyme d'Economie Mixte (SAEM), Val-de-Seine Aménagement
Country : France

Date : 2006 - 2010

Services :
  • Design services and project supervision

Bank reinforcement works of the Somme Canal

3rd stage
Client : Somme Departemental Council
Country : France

Date : 2004 - 2009

Services :
  • Design services and construction supervision
  • Preparation of documents as required by French water legislation